======================================================================
BAT GRB EVENT DATA PROCESSING REPORT
Process Script Ver: batgrbproduct v2.46
Process Start Time: Mon Oct 5 17:18:35 EDT 2015
Host Name: bat1
Current Working Dir: /local/data/bat1/alien/Swift_3rdBATcatalog/event/ground_detect_bursts/scripts
======================================================================
Trigger: 00454779 Segment: 000
BAT Trigger Time: 328891792.689 [s; MET]
Trigger Stop: 328891856.689 [s; MET]
UTC: 2011-06-04T14:49:47.567760 [includes UTCF correction]
Where From?: TDRSS position message
BAT
RA: 270.85885 Dec: 18.39961 [deg; J2000]
Catalogged Source?: NO
Point Source?: YES
GRB Indicated?: YES [ by BAT flight software ]
Image S/N Ratio: 11.42
Image Trigger?: YES
Rate S/N Ratio: 25.8263431402899 [ if not an image trigger ]
Image S/N Ratio: 11.42
Analysis Position: [ source = BAT ]
RA: 270.85885 Dec: 18.39961 [deg; J2000]
Refined Position: [ source = BAT pre-slew burst ]
RA: Dec: [deg; J2000]
{ 00h 00m 00.0s , +00d 00' 00.0" }
+/- N/A [arcmin] (estimated 90% radius based on SNR)
+/- N/A [arcmin] (formal 1-sigma fit error)
SNR:
Angular difference between the analysis and refined position is 5351.103542 arcmin
Partial Coding Fraction: 0 [ including projection effects ]
Duration
T90: N/A +/-
Measured from: N/A
to: N/A [s; relative to TRIGTIME]
T50: N/A +/-
Measured from: N/A
to: N/A [s; relative to TRIGTIME]
WARNING: battblocks failed. Used TDRSS fore/background intervals
Fluence
Peak Flux (peak N/A second)
Measured from: N/A
to: N/A [s; relative to TRIGTIME]
Total Fluence
Measured from: N/A
to: N/A [s; relative to TRIGTIME]
Band 1 Band 2 Band 3 Band 4
15-25 25-50 50-100 100-350 keV
Total 0.000000 0.000000 0.000000 0.000000
0.000000 0.000000 0.000000 0.000000 [error]
Peak 0.000000 0.000000 0.000000 0.000000
0.000000 0.000000 0.000000 0.000000 [error]
[ fluence units of on-axis counts / fully illuminated detector ]
======================================================================
====== Table of the duration information =============================
Value tstart tstop
T100 N/A N/A N/A
T90 N/A N/A N/A
T50 N/A N/A N/A
Peak N/A N/A N/A
====== Spectral Analysis Summary =====================================
Model : spectral model: simple power-law (PL) and cutoff power-law (CPL)
Ph_index : photon index: E^{Ph_index}
Ph_90err : 90% error of the photon index
Epeak : Epeak in keV
Epeak_90err: 90% error of Epeak
Norm : normalization at 50 keV in both the PL model and CPL model
Nomr_90err : 90% error of the normalization
chi2 : Chi-Squared
dof : degree of freedo
=== Time-averaged spectral analysis ===
(Best model with acceptable fit: N/A)
Model Ph_index Ph_90err_low Ph_90err_hi Epeak Epeak_90err_low Epeak_90err_hi Norm Nomr_90err_low Norm_90err_hi chi2 dof
PL N/A N/A N/A - - - N/A N/A N/A N/A N/A
CPL N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
=== 1-s peak spectral analysis ===
(Best model with acceptable fit: N/A)
Model Ph_index Ph_90err_low Ph_90err_hi Epeak Epeak_90err_low Epeak_90err_hi Norm Nomr_90err_low Norm_90err_hi chi2 dof
PL N/A N/A N/A - - - N/A N/A N/A N/A N/A
CPL N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
=== Fluence/Peak Flux Summary ===
Model Band1 Band2 Band3 Band4 Band5 Total
15-25 25-50 50-100 100-350 15-150 15-350 keV
Fluence PL N/A N/A N/A N/A N/A N/A erg/cm2
Note: The mask-weighted lightcurves have units of either count/det or counts/sec/det, where a det is 0.4 x 0.4 = 0.16 sq cm.
Multiple GTIs in the spectrum tstart tstop Photon index: ( )
Multiple GTIs in the spectrum tstart tstop Photon index: ( )
Time interval is from 0.000 sec. to 0.358 sec. Photon index: ( )
Time interval is from 0.000 sec. to 0.358 sec. Photon index: ( )
T90 = N/A sec. Hardness ratio (energy fluence ratio) = N/A
S(15-50 keV) = N/A S(50-150 keV) = N/A
The dash-dotted line and the dashed line traces the fluences calculated from the Band function with Epeak = 15 and 150 keV, respectively. Both lines assume a canonical values of alpha = -1 and beta = -2.5.