XSPEC version: 12.12.1 Build Date/Time: Tue Mar 15 11:46:30 2022 XSPEC12>query no XSPEC12>lmod takagrb /local/data/bat1/prebascript/xspec_taka_lmodel Model package takagrb successfully loaded. XSPEC12>data 1:1 ../sw01085430000b_preslew.pha 1 spectrum in use Spectral Data File: ../sw01085430000b_preslew.pha Spectrum 1 Net count rate (cts/s) for Spectrum:1 8.368e-02 +/- 6.829e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 1-80 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi No response loaded. ***Warning! One or more spectra are missing responses, and are not suitable for fit. XSPEC12>response 1 ../sw01085430000b_preslew.rsp Response successfully loaded. XSPEC12>ignore **-13.0 150.0-** 3 channels (1-3) ignored in spectrum # 1 18 channels (63-80) ignored in spectrum # 1 XSPEC12>mdefine cutep50 (E/50.0)**(-a)*exp(-E*(2.0-a)/b) XSPEC12>model cutep50 Input parameter value, delta, min, bot, top, and max values for ... 1 0.1( 0.01) 1e-22 1e-22 1e+22 1e+22 1:cutep50:a> 1.0000 1.00000E-02 -10.0000 -10.0000 10.0000 10.000 1 0.1( 0.01) 1e-22 1e-22 1e+22 1e+22 2:cutep50:b> 50.000 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. 1 0.01( 0.01) 0 0 1e+20 1e+24 3:cutep50:norm> 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model cutep50<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 cutep50 a 1.00000 +/- 0.0 2 1 cutep50 b 50.0000 +/- 0.0 3 1 cutep50 norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 1.933193e+06 using 59 bins. Test statistic : Chi-Squared 1.933193e+06 using 59 bins. Null hypothesis probability of 0.000000e+00 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>renorm Fit statistic : Chi-Squared 63.11 using 59 bins. Test statistic : Chi-Squared 63.11 using 59 bins. Null hypothesis probability of 2.40e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:a 2:b 3:norm 60.601 0.195217 -1 0.975462 56.9814 0.0123980 59.7687 69.6177 -1 0.979990 61.5061 0.0117684 59.4261 11.6816 -1 0.999072 64.2806 0.0112422 59.1944 13.0144 -1 1.02498 66.1940 0.0107750 58.9975 21.5041 -1 1.05326 67.7466 0.0103521 58.8212 24.7011 -1 1.08170 69.1758 0.00996646 58.795 25.9916 -2 1.26110 76.9015 0.00770858 57.9186 671.066 -2 1.37883 89.7353 0.00677538 57.5964 430.75 -2 1.43754 104.460 0.00631030 57.5904 233.977 -3 1.50538 126.273 0.00577723 ======================================== Variances and Principal Axes 1 2 3 1.1318E-07| 0.0044 0.0000 1.0000 3.1498E-02| 1.0000 -0.0036 -0.0044 8.2624E+03| 0.0036 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.397e-01 2.990e+01 -1.048e-03 2.990e+01 8.262e+03 -2.509e-01 -1.048e-03 -2.509e-01 8.352e-06 ------------------------------------ ======================================================================== Model cutep50<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 cutep50 a 1.50538 +/- 0.373815 2 1 cutep50 b 126.273 +/- 90.8970 3 1 cutep50 norm 5.77723E-03 +/- 2.88992E-03 ________________________________________________________________________ Fit statistic : Chi-Squared 57.59 using 59 bins. Test statistic : Chi-Squared 57.59 using 59 bins. Null hypothesis probability of 4.16e-01 with 56 degrees of freedom XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:a 2:b 3:norm 57.4615 0.29488 -3 1.51116 139.776 0.00574665 57.4585 45.5438 -4 1.51806 145.873 0.00569664 ======================================== Variances and Principal Axes 1 2 3 9.1923E-08| 0.0034 0.0000 1.0000 2.1860E-02| 1.0000 -0.0016 -0.0034 4.3479E+04| 0.0016 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.304e-01 6.871e+01 -8.849e-04 6.871e+01 4.348e+04 -5.127e-01 -8.849e-04 -5.127e-01 6.393e-06 ------------------------------------ ======================================================================== Model cutep50<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 cutep50 a 1.51806 +/- 0.361166 2 1 cutep50 b 145.873 +/- 208.516 3 1 cutep50 norm 5.69664E-03 +/- 2.52841E-03 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:a 2:b 3:norm 57.4584 0.0119595 -3 1.51890 147.003 0.00568972 ======================================== Variances and Principal Axes 1 2 3 9.0010E-08| 0.0033 0.0000 1.0000 2.0910E-02| 1.0000 -0.0014 -0.0033 5.4334E+04| 0.0014 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 7.671e+01 -8.685e-04 7.671e+01 5.433e+04 -5.662e-01 -8.685e-04 -5.662e-01 6.219e-06 ------------------------------------ ======================================================================== Model cutep50<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 cutep50 a 1.51890 +/- 0.359467 2 1 cutep50 b 147.003 +/- 233.096 3 1 cutep50 norm 5.68972E-03 +/- 2.49370E-03 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom XSPEC12>log bat_spec_cutplep.log Logging to file:bat_spec_cutplep.log XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:18 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Channels Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52006E-02 Current model list: ======================================================================== Model cutep50<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 cutep50 a 1.51890 +/- 0.359467 2 1 cutep50 b 147.003 +/- 233.096 3 1 cutep50 norm 5.68972E-03 +/- 2.49370E-03 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off XSPEC12>flux 20.0 50.0 Model Flux 0.30109 photons (1.5123e-08 ergs/cm^2/s) range (20.000 - 50.000 keV) XSPEC12>flux 50.0 150.0 Model Flux 0.18025 photons (2.4253e-08 ergs/cm^2/s) range (50.000 - 150.00 keV) XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870723 2.078 (-0.648527,0.558745) XSPEC12>error 2 Parameter Confidence Range (2.706) ***Warning: Zero alpha-matrix diagonal element for parameter 1 ***Warning: Zero alpha-matrix diagonal element for parameter 3 Parameter 1 is pegged at 1.51925 due to zero or negative pivot element, likely caused by the fit being insensitive to the parameter. Parameter 3 is pegged at 0.00568705 due to zero or negative pivot element, likely caused by the fit being insensitive to the parameter. Fit error occurred during lower bound error calculation. ***Warning: Number of trials exceeded before bracketing of delta fit-stat. Last attempt: 10000, with delta statistic: 0.178897 *** Parameter upper bound is INVALID. 2 0 0 (-147.335,-147.335) XSPEC12>error 3 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 0.00568655, 0.00342952 and delta stat 0, 4.13883 but latest trial 0.00410213 gives 5.13578 Suggest that you check this result using the steppar command. 3 0.00455804 0.0128834 (-0.00112842,0.00719695) XSPEC12>flux 15.0 350.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.6686 photons (6.1721e-08 ergs/cm^2/s) range (15.000 - 350.00 keV) Error range 0.000 - 0.6921 (0.000 - 6.692e-08) (90.00% confidence) XSPEC12>flux 15.0 150.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.61552 photons (4.3101e-08 ergs/cm^2/s) range (15.000 - 150.00 keV) Error range 0.000 - 0.6198 (0.000 - 4.320e-08) (90.00% confidence) XSPEC12>flux 15.0 25.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.22382 photons (6.9317e-09 ergs/cm^2/s) range (15.000 - 25.000 keV) Error range 0.000 - 0.2398 (0.000 - 7.408e-09) (90.00% confidence) XSPEC12>flux 25.0 50.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.21144 photons (1.1912e-08 ergs/cm^2/s) range (25.000 - 50.000 keV) Error range 0.000 - 0.2181 (0.000 - 1.230e-08) (90.00% confidence) XSPEC12>flux 50.0 100.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.13157 photons (1.4757e-08 ergs/cm^2/s) range (50.000 - 100.00 keV) Error range 0.000 - 0.1349 (0.000 - 1.523e-08) (90.00% confidence) XSPEC12>flux 100.0 150.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.048695 photons (9.5004e-09 ergs/cm^2/s) range (100.00 - 150.00 keV) Error range 0.000 - 0.05080 (0.000 - 9.940e-09) (90.00% confidence) XSPEC12>flux 100.0 350.0 err 100 90 Parameter distribution is derived from fit covariance matrix. Model Flux 0.10177 photons (2.812e-08 ergs/cm^2/s) range (100.00 - 350.00 keV) Error range 0.000 - 0.1247 (0.000 - 3.574e-08) (90.00% confidence) XSPEC12>log none Log file closed logging switched off XSPEC12>setplot energy XSPEC12>setplot command sc white 1 XSPEC12>setplot command cpd bat_spec_cutplep.gif/gif 2 XSPEC12>plot ldata delchi XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part1_15_350kev_fit.xcm !XSPEC12>log none No log file open !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_15_350kev.log Logging to file:pphcut_15_350kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:19 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52021E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 0.749827, 0.749879 and delta stat 2.69502, 2.71887 but latest trial 0.749855 gives 2.61996 Suggest that you check this result using the steppar command. 5 0.584421 0.749853 (-0.0840364,0.0813953) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870646 1.81027 (-0.648564,0.291062) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part2_15_150kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 15.0 Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 150.0 Fit statistic : Chi-Squared 60.14 using 59 bins. Test statistic : Chi-Squared 60.14 using 59 bins. Null hypothesis probability of 3.28e-01 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000249632 -1 1.51923 306.303 0.615413 ======================================== Variances and Principal Axes 1 2 5 1.0477E-03| -0.0449 0.0000 0.9990 1.0101E-02| 0.9990 -0.0005 0.0449 5.0727E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.457e+02 3.767e-03 2.457e+02 5.073e+05 6.938e+00 3.767e-03 6.938e+00 1.161e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51923 +/- 0.359327 2 1 pphcut HighECut keV 306.303 +/- 712.227 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 0.615413 +/- 3.40722E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 4.79258e-05 0 1.51924 306.303 0.615414 ======================================== Variances and Principal Axes 1 2 5 1.0477E-03| -0.0449 0.0000 0.9990 1.0100E-02| 0.9990 -0.0005 0.0449 5.0781E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.459e+02 3.767e-03 2.459e+02 5.078e+05 6.941e+00 3.767e-03 6.941e+00 1.161e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51924 +/- 0.359351 2 1 pphcut HighECut keV 306.303 +/- 712.608 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 0.615414 +/- 3.40716E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 4.53851e-05 3 1.51924 306.303 0.615414 ======================================== Variances and Principal Axes 1 2 5 1.0477E-03| -0.0449 0.0000 0.9990 1.0100E-02| 0.9990 -0.0005 0.0449 5.0782E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.459e+02 3.770e-03 2.459e+02 5.078e+05 6.947e+00 3.770e-03 6.947e+00 1.161e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51924 +/- 0.359356 2 1 pphcut HighECut keV 306.303 +/- 712.612 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 0.615414 +/- 3.40741E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_15_150kev.log Logging to file:pphcut_15_150kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:19 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52022E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51924 +/- 0.359356 2 1 pphcut HighECut keV 306.303 +/- 712.612 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 0.615414 +/- 3.40741E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 0.559255 0.671293 (-0.0561587,0.0558792) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870636 1.8147 (-0.648599,0.295466) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part3_15_25kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 4 25.0 Fit statistic : Chi-Squared 1482.38 using 59 bins. Test statistic : Chi-Squared 1482.38 using 59 bins. Null hypothesis probability of 3.74e-273 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000199032 4 1.51921 306.231 0.223772 ======================================== Variances and Principal Axes 1 2 5 1.3553E-04| -0.1540 0.0001 0.9881 1.0322E-02| 0.9881 -0.0005 0.1540 5.0743E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 5.037e-03 2.458e+02 5.074e+05 7.199e+00 5.037e-03 7.199e+00 4.792e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359342 2 1 pphcut HighECut keV 306.231 +/- 712.342 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 25.0000 frozen 5 1 pphcut norm 0.223772 +/- 2.18903E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000199032 4 1.51921 306.231 0.223772 ======================================== Variances and Principal Axes 1 2 5 1.3553E-04| -0.1540 0.0001 0.9881 1.0322E-02| 0.9881 -0.0005 0.1540 5.0743E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 5.037e-03 2.458e+02 5.074e+05 7.199e+00 5.037e-03 7.199e+00 4.792e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359342 2 1 pphcut HighECut keV 306.231 +/- 712.342 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 25.0000 frozen 5 1 pphcut norm 0.223772 +/- 2.18903E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000199032 4 1.51921 306.231 0.223772 ======================================== Variances and Principal Axes 1 2 5 1.3553E-04| -0.1540 0.0001 0.9881 1.0322E-02| 0.9881 -0.0005 0.1540 5.0743E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 5.037e-03 2.458e+02 5.074e+05 7.199e+00 5.037e-03 7.199e+00 4.792e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359342 2 1 pphcut HighECut keV 306.231 +/- 712.342 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 25.0000 frozen 5 1 pphcut norm 0.223772 +/- 2.18903E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_15_25kev.log Logging to file:pphcut_15_25kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:19 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52022E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359342 2 1 pphcut HighECut keV 306.231 +/- 712.342 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 25.0000 frozen 5 1 pphcut norm 0.223772 +/- 2.18903E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 0.188969 0.258409 (-0.0348033,0.0346368) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870636 1.77996 (-0.648574,0.260753) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part4_25_50kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 25.0 Fit statistic : Chi-Squared 148.83 using 59 bins. Test statistic : Chi-Squared 148.83 using 59 bins. Null hypothesis probability of 2.35e-10 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 50.0 Fit statistic : Chi-Squared 1743.84 using 59 bins. Test statistic : Chi-Squared 1743.84 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000241117 -1 1.51924 306.308 0.211411 ======================================== Variances and Principal Axes 1 2 5 1.2382E-04| -0.0209 0.0000 0.9998 1.0086E-02| 0.9998 -0.0005 0.0209 5.0730E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.457e+02 -2.559e-03 2.457e+02 5.073e+05 -5.713e+00 -2.559e-03 -5.713e+00 1.925e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51924 +/- 0.359322 2 1 pphcut HighECut keV 306.308 +/- 712.249 3 1 pphcut eMin keV 25.0000 frozen 4 1 pphcut eMax keV 50.0000 frozen 5 1 pphcut norm 0.211411 +/- 1.38745E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 4.09834e-05 0 1.51924 306.309 0.211411 ======================================== Variances and Principal Axes 1 2 5 1.2381E-04| -0.0209 0.0000 0.9998 1.0086E-02| 0.9998 -0.0005 0.0209 5.0787E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.459e+02 -2.555e-03 2.459e+02 5.079e+05 -5.708e+00 -2.555e-03 -5.708e+00 1.923e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51924 +/- 0.359350 2 1 pphcut HighECut keV 306.309 +/- 712.653 3 1 pphcut eMin keV 25.0000 frozen 4 1 pphcut eMax keV 50.0000 frozen 5 1 pphcut norm 0.211411 +/- 1.38681E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 5.74774e-05 -3 1.51927 306.368 0.211410 ======================================== Variances and Principal Axes 1 2 5 1.2381E-04| -0.0209 0.0000 0.9998 1.0086E-02| 0.9998 -0.0005 0.0209 5.0779E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 -2.556e-03 2.458e+02 5.078e+05 -5.710e+00 -2.556e-03 -5.710e+00 1.924e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51927 +/- 0.359319 2 1 pphcut HighECut keV 306.368 +/- 712.596 3 1 pphcut eMin keV 25.0000 frozen 4 1 pphcut eMax keV 50.0000 frozen 5 1 pphcut norm 0.211410 +/- 1.38698E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_25_50kev.log Logging to file:pphcut_25_50kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:20 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52023E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51927 +/- 0.359319 2 1 pphcut HighECut keV 306.368 +/- 712.596 3 1 pphcut eMin keV 25.0000 frozen 4 1 pphcut eMax keV 50.0000 frozen 5 1 pphcut norm 0.211410 +/- 1.38698E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 0.190278 0.235179 (-0.0211323,0.0237689) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870637 1.81132 (-0.648632,0.292053) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part5_50_100kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 50.0 Fit statistic : Chi-Squared 1313.23 using 59 bins. Test statistic : Chi-Squared 1313.23 using 59 bins. Null hypothesis probability of 7.67e-238 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 100.0 Fit statistic : Chi-Squared 6068.46 using 59 bins. Test statistic : Chi-Squared 6068.46 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000294695 -2 1.51925 306.337 0.131546 ======================================== Variances and Principal Axes 1 2 5 4.7668E-05| 0.0779 -0.0000 0.9970 1.0142E-02| 0.9970 -0.0005 -0.0779 5.0713E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.456e+02 -1.272e-03 2.456e+02 5.071e+05 -1.009e+00 -1.272e-03 -1.009e+00 1.109e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51925 +/- 0.359257 2 1 pphcut HighECut keV 306.337 +/- 712.127 3 1 pphcut eMin keV 50.0000 frozen 4 1 pphcut eMax keV 100.000 frozen 5 1 pphcut norm 0.131546 +/- 1.05294E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 5.18529e-05 2 1.51925 306.337 0.131547 ======================================== Variances and Principal Axes 1 2 5 4.7669E-05| 0.0779 -0.0000 0.9970 1.0142E-02| 0.9970 -0.0005 -0.0779 5.0783E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 -1.275e-03 2.458e+02 5.078e+05 -1.016e+00 -1.275e-03 -1.016e+00 1.109e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51925 +/- 0.359263 2 1 pphcut HighECut keV 306.337 +/- 712.624 3 1 pphcut eMin keV 50.0000 frozen 4 1 pphcut eMax keV 100.000 frozen 5 1 pphcut norm 0.131547 +/- 1.05307E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 5.18529e-05 5 1.51925 306.337 0.131547 ======================================== Variances and Principal Axes 1 2 5 4.7669E-05| 0.0779 -0.0000 0.9970 1.0142E-02| 0.9970 -0.0005 -0.0779 5.0783E+05| 0.0005 1.0000 -0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.458e+02 -1.275e-03 2.458e+02 5.078e+05 -1.016e+00 -1.275e-03 -1.016e+00 1.109e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51925 +/- 0.359263 2 1 pphcut HighECut keV 306.337 +/- 712.624 3 1 pphcut eMin keV 50.0000 frozen 4 1 pphcut eMax keV 100.000 frozen 5 1 pphcut norm 0.131547 +/- 1.05307E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_50_100kev.log Logging to file:pphcut_50_100kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:20 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52023E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51925 +/- 0.359263 2 1 pphcut HighECut keV 306.337 +/- 712.624 3 1 pphcut eMin keV 50.0000 frozen 4 1 pphcut eMax keV 100.000 frozen 5 1 pphcut norm 0.131547 +/- 1.05307E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 0.114506 0.148796 (-0.0170406,0.0172493) !XSPEC12>error 1 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 1.77277, 1.77294 and delta stat 2.39819, 2.79197 but latest trial 1.77277 gives 2.85839 Suggest that you check this result using the steppar command. 1 0.870637 1.77285 (-0.648615,0.253602) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part6_100_150kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 100.0 Fit statistic : Chi-Squared 11256.16 using 59 bins. Test statistic : Chi-Squared 11256.16 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 150.0 Fit statistic : Chi-Squared 58539.49 using 59 bins. Test statistic : Chi-Squared 58539.49 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000336588 -1 1.51921 306.239 0.0486827 ======================================== Variances and Principal Axes 1 2 5 6.5474E-06| 0.0563 -0.0000 0.9984 1.0111E-02| 0.9984 -0.0005 -0.0563 5.0697E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.455e+02 2.570e-03 2.455e+02 5.070e+05 6.479e+00 2.570e-03 6.479e+00 1.214e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359176 2 1 pphcut HighECut keV 306.239 +/- 712.018 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 4.86827E-02 +/- 1.10176E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000183471 2 1.51921 306.239 0.0486827 ======================================== Variances and Principal Axes 1 2 5 6.5475E-06| 0.0563 -0.0000 0.9984 1.0111E-02| 0.9984 -0.0005 -0.0563 5.0708E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.456e+02 2.570e-03 2.456e+02 5.071e+05 6.478e+00 2.570e-03 6.478e+00 1.213e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359196 2 1 pphcut HighECut keV 306.239 +/- 712.096 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 4.86827E-02 +/- 1.10158E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000183471 2 1.51921 306.239 0.0486827 ======================================== Variances and Principal Axes 1 2 5 6.5475E-06| 0.0563 -0.0000 0.9984 1.0111E-02| 0.9984 -0.0005 -0.0563 5.0708E+05| 0.0005 1.0000 0.0000 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.456e+02 2.570e-03 2.456e+02 5.071e+05 6.478e+00 2.570e-03 6.478e+00 1.213e-04 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359196 2 1 pphcut HighECut keV 306.239 +/- 712.096 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 4.86827E-02 +/- 1.10158E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_100_150kev.log Logging to file:pphcut_100_150kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:20 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52022E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359196 2 1 pphcut HighECut keV 306.239 +/- 712.096 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 150.000 frozen 5 1 pphcut norm 4.86827E-02 +/- 1.10158E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 0.0486827, 0.0635074 and delta stat 0, 2.74925 but latest trial 0.0634097 gives 4.43129 Suggest that you check this result using the steppar command. 5 0.0301601 0.0560951 (-0.0185226,0.00741234) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870637 1.81435 (-0.648662,0.295054) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pphcut_part7_100_350kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pphcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.0 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.00000 +/- 0.0 2 1 pphcut HighECut keV 80.0000 +/- 0.0 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 190.77 using 59 bins. Test statistic : Chi-Squared 190.77 using 59 bins. Null hypothesis probability of 1.34e-16 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5335 3.35837 -2 1.45879 128.758 0.652431 57.7735 5.51248 -3 1.48274 190.145 0.656850 57.4961 1.76424 -4 1.50108 247.146 0.664361 57.4611 0.693086 -5 1.51258 285.105 0.667214 57.4584 0.196332 -6 1.51741 301.171 0.668145 ======================================== Variances and Principal Axes 1 2 5 1.2286E-03| 0.0555 -0.0001 0.9985 1.0149E-02| 0.9985 -0.0006 -0.0555 3.8514E+05| 0.0006 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.298e-01 2.147e+02 1.594e-02 2.147e+02 3.851e+05 2.948e+01 1.594e-02 2.948e+01 3.512e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51741 +/- 0.360277 2 1 pphcut HighECut keV 301.171 +/- 620.600 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668145 +/- 5.92652E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.0213128 -3 1.51896 305.544 0.668413 ======================================== Variances and Principal Axes 1 2 5 1.2334E-03| 0.0574 -0.0001 0.9983 1.0123E-02| 0.9983 -0.0005 -0.0574 4.7578E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.293e-01 2.382e+02 1.624e-02 2.382e+02 4.758e+05 3.347e+01 1.624e-02 3.347e+01 3.617e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51896 +/- 0.359617 2 1 pphcut HighECut keV 305.544 +/- 689.766 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668413 +/- 6.01392E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00263605 -3 1.51921 306.231 0.668457 ======================================== Variances and Principal Axes 1 2 5 1.2345E-03| 0.0581 -0.0001 0.9983 1.0114E-02| 0.9983 -0.0005 -0.0581 5.0291E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.447e+02 1.619e-02 2.447e+02 5.029e+05 3.433e+01 1.619e-02 3.433e+01 3.608e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359378 2 1 pphcut HighECut keV 306.231 +/- 709.158 3 1 pphcut eMin keV 15.0000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.668457 +/- 6.00647E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 100.0 Fit statistic : Chi-Squared 11256.16 using 59 bins. Test statistic : Chi-Squared 11256.16 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000361464 3 1.51921 306.231 0.101728 ======================================== Variances and Principal Axes 1 2 5 2.8066E-05| 0.1466 -0.0001 0.9892 1.0298E-02| 0.9892 -0.0005 -0.1466 5.0686E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.455e+02 1.500e-02 2.455e+02 5.069e+05 3.404e+01 1.500e-02 3.404e+01 2.534e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359122 2 1 pphcut HighECut keV 306.231 +/- 711.939 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.101728 +/- 5.03436E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000361464 3 1.51921 306.231 0.101728 ======================================== Variances and Principal Axes 1 2 5 2.8066E-05| 0.1466 -0.0001 0.9892 1.0298E-02| 0.9892 -0.0005 -0.1466 5.0686E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.455e+02 1.500e-02 2.455e+02 5.069e+05 3.404e+01 1.500e-02 3.404e+01 2.534e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359122 2 1 pphcut HighECut keV 306.231 +/- 711.939 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.101728 +/- 5.03436E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000361464 2 1.51921 306.231 0.101728 ======================================== Variances and Principal Axes 1 2 5 2.8066E-05| 0.1466 -0.0001 0.9892 1.0298E-02| 0.9892 -0.0005 -0.1466 5.0686E+05| 0.0005 1.0000 0.0001 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.455e+02 1.500e-02 2.455e+02 5.069e+05 3.404e+01 1.500e-02 3.404e+01 2.534e-03 ------------------------------------ ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359122 2 1 pphcut HighECut keV 306.231 +/- 711.939 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.101728 +/- 5.03436E-02 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pphcut_100_350kev.log Logging to file:pphcut_100_350kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:20 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52022E-02 Current model list: ======================================================================== Model pphcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pphcut PhoIndex 1.51921 +/- 0.359122 2 1 pphcut HighECut keV 306.231 +/- 711.939 3 1 pphcut eMin keV 100.000 frozen 4 1 pphcut eMax keV 350.000 frozen 5 1 pphcut norm 0.101728 +/- 5.03436E-02 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part1_15_350kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_15_350kev.log Logging to file:pegcut_15_350kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:20 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 75718.4, 79612.9 and delta stat 1.51364, 4.46715 but latest trial 77477.1 gives 8.35927 Suggest that you check this result using the steppar command. 5 42655.1 77665.7 (-19067.3,15943.2) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.87064 1.81463 (-0.648387,0.295607) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part2_15_150kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 4 150.0 Fit statistic : Chi-Squared 124.68 using 59 bins. Test statistic : Chi-Squared 124.68 using 59 bins. Null hypothesis probability of 3.85e-07 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000643208 4 1.51903 305.821 43113.6 ======================================== Variances and Principal Axes 1 2 5 6.9618E-03| 1.0000 -0.0005 0.0000 3.6981E+05| -0.0005 -0.9931 0.1172 1.0180E+07| -0.0000 -0.1172 -0.9931 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 4.021e+02 2.451e+02 5.046e+05 1.142e+06 4.021e+02 1.142e+06 1.005e+07 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359339 2 1 pegcut HighECut keV 305.821 +/- 710.347 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 4.31136E+04 +/- 3169.45 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000643208 4 1.51903 305.821 43113.6 ======================================== Variances and Principal Axes 1 2 5 6.9618E-03| 1.0000 -0.0005 0.0000 3.6981E+05| -0.0005 -0.9931 0.1172 1.0180E+07| -0.0000 -0.1172 -0.9931 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 4.021e+02 2.451e+02 5.046e+05 1.142e+06 4.021e+02 1.142e+06 1.005e+07 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359339 2 1 pegcut HighECut keV 305.821 +/- 710.347 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 4.31136E+04 +/- 3169.45 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000643208 4 1.51903 305.821 43113.6 ======================================== Variances and Principal Axes 1 2 5 6.9618E-03| 1.0000 -0.0005 0.0000 3.6981E+05| -0.0005 -0.9931 0.1172 1.0180E+07| -0.0000 -0.1172 -0.9931 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 4.021e+02 2.451e+02 5.046e+05 1.142e+06 4.021e+02 1.142e+06 1.005e+07 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359339 2 1 pegcut HighECut keV 305.821 +/- 710.347 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 4.31136E+04 +/- 3169.45 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_15_150kev.log Logging to file:pegcut_15_150kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:21 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359339 2 1 pegcut HighECut keV 305.821 +/- 710.347 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 4.31136E+04 +/- 3169.45 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 37739.5 48261.5 (-5374.1,5147.9) !XSPEC12>error 1 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 1.78676, 1.79337 and delta stat 2.60907, 2.95347 but latest trial 1.78867 gives 2.99718 Suggest that you check this result using the steppar command. 1 0.870636 1.79006 (-0.648391,0.271036) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part3_15_25kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 4 25.0 Fit statistic : Chi-Squared 22586.83 using 59 bins. Test statistic : Chi-Squared 22586.83 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000567426 5 1.51903 305.821 6933.70 ======================================== Variances and Principal Axes 1 2 5 3.8622E-03| 1.0000 -0.0004 -0.0001 2.6146E+05| -0.0002 -0.6375 0.7704 6.7153E+05| -0.0004 -0.7704 -0.6375 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.452e+02 1.443e+02 2.452e+02 5.048e+05 2.014e+05 1.443e+02 2.014e+05 4.281e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359384 2 1 pegcut HighECut keV 305.821 +/- 710.525 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 25.0000 frozen 5 1 pegcut norm 6933.70 +/- 654.321 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000567426 5 1.51903 305.821 6933.70 ======================================== Variances and Principal Axes 1 2 5 3.8622E-03| 1.0000 -0.0004 -0.0001 2.6146E+05| -0.0002 -0.6375 0.7704 6.7153E+05| -0.0004 -0.7704 -0.6375 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.452e+02 1.443e+02 2.452e+02 5.048e+05 2.014e+05 1.443e+02 2.014e+05 4.281e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359384 2 1 pegcut HighECut keV 305.821 +/- 710.525 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 25.0000 frozen 5 1 pegcut norm 6933.70 +/- 654.321 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000567426 5 1.51903 305.821 6933.70 ======================================== Variances and Principal Axes 1 2 5 3.8622E-03| 1.0000 -0.0004 -0.0001 2.6146E+05| -0.0002 -0.6375 0.7704 6.7153E+05| -0.0004 -0.7704 -0.6375 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.292e-01 2.452e+02 1.443e+02 2.452e+02 5.048e+05 2.014e+05 1.443e+02 2.014e+05 4.281e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359384 2 1 pegcut HighECut keV 305.821 +/- 710.525 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 25.0000 frozen 5 1 pegcut norm 6933.70 +/- 654.321 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_15_25kev.log Logging to file:pegcut_15_25kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:21 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359384 2 1 pegcut HighECut keV 305.821 +/- 710.525 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 25.0000 frozen 5 1 pegcut norm 6933.70 +/- 654.321 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 7954.92, 7961.55 and delta stat 2.65178, 2.8872 but latest trial 7960.72 gives 2.90522 Suggest that you check this result using the steppar command. 5 5889.81 7958.23 (-1043.89,1024.54) !XSPEC12>error 1 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 1.78147, 1.78224 and delta stat 2.69238, 2.74367 but latest trial 1.78176 gives 2.68742 Suggest that you check this result using the steppar command. 1 0.870636 1.78186 (-0.648391,0.26283) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part4_25_50kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 25.0 Fit statistic : Chi-Squared 63.24 using 59 bins. Test statistic : Chi-Squared 63.24 using 59 bins. Null hypothesis probability of 2.36e-01 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 50.0 Fit statistic : Chi-Squared 6359.83 using 59 bins. Test statistic : Chi-Squared 6359.83 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000618012 4 1.51903 305.821 11917.1 ======================================== Variances and Principal Axes 1 2 5 9.9609E-03| 1.0000 -0.0005 -0.0000 2.1799E+05| 0.0004 0.7700 0.6380 9.2234E+05| -0.0003 -0.6380 0.7700 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 -1.611e+02 2.451e+02 5.047e+05 -3.460e+05 -1.611e+02 -3.460e+05 6.356e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359359 2 1 pegcut HighECut keV 305.821 +/- 710.422 3 1 pegcut eMin keV 25.0000 frozen 4 1 pegcut eMax keV 50.0000 frozen 5 1 pegcut norm 1.19171E+04 +/- 797.265 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000618012 3 1.51903 305.821 11917.1 ======================================== Variances and Principal Axes 1 2 5 9.9609E-03| 1.0000 -0.0005 -0.0000 2.1799E+05| 0.0004 0.7700 0.6380 9.2234E+05| -0.0003 -0.6380 0.7700 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 -1.611e+02 2.451e+02 5.047e+05 -3.460e+05 -1.611e+02 -3.460e+05 6.356e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359359 2 1 pegcut HighECut keV 305.821 +/- 710.422 3 1 pegcut eMin keV 25.0000 frozen 4 1 pegcut eMax keV 50.0000 frozen 5 1 pegcut norm 1.19171E+04 +/- 797.265 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000618012 3 1.51903 305.821 11917.1 ======================================== Variances and Principal Axes 1 2 5 9.9609E-03| 1.0000 -0.0005 -0.0000 2.1800E+05| 0.0004 0.7700 0.6380 9.2235E+05| -0.0003 -0.6380 0.7700 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.451e+02 -1.611e+02 2.451e+02 5.047e+05 -3.460e+05 -1.611e+02 -3.460e+05 6.356e+05 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 710.439 3 1 pegcut eMin keV 25.0000 frozen 4 1 pegcut eMax keV 50.0000 frozen 5 1 pegcut norm 1.19171E+04 +/- 797.262 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_25_50kev.log Logging to file:pegcut_25_50kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:21 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 710.439 3 1 pegcut eMin keV 25.0000 frozen 4 1 pegcut eMax keV 50.0000 frozen 5 1 pegcut norm 1.19171E+04 +/- 797.262 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 10725 13280.4 (-1191.81,1363.6) !XSPEC12>error 1 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 1.81338, 1.81363 and delta stat 2.69376, 2.72557 but latest trial 1.8135 gives 2.68868 Suggest that you check this result using the steppar command. 1 0.870637 1.8135 (-0.648606,0.294262) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part5_50_100kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 50.0 Fit statistic : Chi-Squared 127.22 using 59 bins. Test statistic : Chi-Squared 127.22 using 59 bins. Null hypothesis probability of 1.84e-07 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 100.0 Fit statistic : Chi-Squared 3709.47 using 59 bins. Test statistic : Chi-Squared 3709.47 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000661682 3 1.51903 305.821 14761.2 ======================================== Variances and Principal Axes 1 2 5 4.1204E-03| 1.0000 -0.0005 0.0001 5.0347E+05| -0.0005 -0.9995 -0.0329 1.4806E+06| -0.0001 -0.0329 0.9995 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 -1.094e+02 2.450e+02 5.045e+05 -3.210e+04 -1.094e+02 -3.210e+04 1.480e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359292 2 1 pegcut HighECut keV 305.821 +/- 710.301 3 1 pegcut eMin keV 50.0000 frozen 4 1 pegcut eMax keV 100.000 frozen 5 1 pegcut norm 1.47612E+04 +/- 1216.37 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000661682 3 1.51903 305.821 14761.2 ======================================== Variances and Principal Axes 1 2 5 4.1204E-03| 1.0000 -0.0005 0.0001 5.0347E+05| -0.0005 -0.9995 -0.0329 1.4806E+06| -0.0001 -0.0329 0.9995 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 -1.094e+02 2.450e+02 5.045e+05 -3.210e+04 -1.094e+02 -3.210e+04 1.480e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359292 2 1 pegcut HighECut keV 305.821 +/- 710.301 3 1 pegcut eMin keV 50.0000 frozen 4 1 pegcut eMax keV 100.000 frozen 5 1 pegcut norm 1.47612E+04 +/- 1216.37 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000661682 3 1.51903 305.821 14761.2 ======================================== Variances and Principal Axes 1 2 5 4.1204E-03| 1.0000 -0.0005 0.0001 5.0350E+05| -0.0005 -0.9995 -0.0328 1.4806E+06| -0.0001 -0.0328 0.9995 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 -1.094e+02 2.450e+02 5.046e+05 -3.207e+04 -1.094e+02 -3.207e+04 1.480e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359297 2 1 pegcut HighECut keV 305.821 +/- 710.318 3 1 pegcut eMin keV 50.0000 frozen 4 1 pegcut eMax keV 100.000 frozen 5 1 pegcut norm 1.47612E+04 +/- 1216.37 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_50_100kev.log Logging to file:pegcut_50_100kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:21 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359297 2 1 pegcut HighECut keV 305.821 +/- 710.318 3 1 pegcut eMin keV 50.0000 frozen 4 1 pegcut eMax keV 100.000 frozen 5 1 pegcut norm 1.47612E+04 +/- 1216.37 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) 5 12775.2 16757.6 (-1985.98,1996.41) !XSPEC12>error 1 Parameter Confidence Range (2.706) Apparent non-monotonicity in statistic space detected. Current bracket values 1.76795, 1.77459 and delta stat 2.68089, 3.14114 but latest trial 1.76911 gives 2.39794 Suggest that you check this result using the steppar command. 1 0.870636 1.77127 (-0.648391,0.252241) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part6_100_150kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 100 Fit statistic : Chi-Squared 573.34 using 59 bins. Test statistic : Chi-Squared 573.34 using 59 bins. Null hypothesis probability of 7.16e-87 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>newpar 4 150 Fit statistic : Chi-Squared 10956.49 using 59 bins. Test statistic : Chi-Squared 10956.49 using 59 bins. Null hypothesis probability of 0.00e+00 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000701775 2 1.51903 305.821 9501.62 ======================================== Variances and Principal Axes 1 2 5 1.6830E-03| 1.0000 -0.0007 0.0001 1.4282E+05| -0.0007 -0.9643 0.2650 5.2919E+06| -0.0001 -0.2650 -0.9643 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.450e+02 5.268e+02 2.450e+02 5.044e+05 1.316e+06 5.268e+02 1.316e+06 4.930e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359217 2 1 pegcut HighECut keV 305.821 +/- 710.201 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 9501.62 +/- 2220.44 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000701775 2 1.51903 305.821 9501.62 ======================================== Variances and Principal Axes 1 2 5 1.6830E-03| 1.0000 -0.0007 0.0001 1.4282E+05| -0.0007 -0.9643 0.2650 5.2923E+06| -0.0001 -0.2650 -0.9643 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.450e+02 5.268e+02 2.450e+02 5.044e+05 1.316e+06 5.268e+02 1.316e+06 4.931e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359222 2 1 pegcut HighECut keV 305.821 +/- 710.218 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 9501.62 +/- 2220.52 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000695688 3 1.51903 305.821 9501.62 ======================================== Variances and Principal Axes 1 2 5 1.6830E-03| 1.0000 -0.0007 0.0001 1.4283E+05| -0.0007 -0.9643 0.2650 5.2921E+06| -0.0001 -0.2650 -0.9643 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.450e+02 5.268e+02 2.450e+02 5.044e+05 1.316e+06 5.268e+02 1.316e+06 4.931e+06 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359227 2 1 pegcut HighECut keV 305.821 +/- 710.219 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 9501.62 +/- 2220.47 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_100_150kev.log Logging to file:pegcut_100_150kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:21 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359227 2 1 pegcut HighECut keV 305.821 +/- 710.219 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 150.000 frozen 5 1 pegcut norm 9501.62 +/- 2220.47 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>@/local/data/bat2/BATtools/battools/bin/GRB_spec_fit_v2/bat_pegcut_part7_100_350kev_fit.xcm !XSPEC12>log none Log file closed !XSPEC12>query no !XSPEC12>model pegcut ; 1.0000 1.00000E-02 -10.0000 -9.0000 9.0000 10.000 ; 80.00 1.00000E-02 1.00000E-02 1.0000 1000.0 10000. ; 15.000 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 350.00 -1.00000E-02 -100.00 -100.00 1.00000E+10 1.00000E+10 ; 1.0000 1.00000E-02 0.0000 0.0000 1.00000E+24 1.00000E+24 ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.00000 +/- 0.0 2 1 pegcut HighECut keV 80.0000 +/- 0.0 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 1.00000 +/- 0.0 ________________________________________________________________________ Fit statistic : Chi-Squared 418.27 using 59 bins. Test statistic : Chi-Squared 418.27 using 59 bins. Null hypothesis probability of 7.05e-57 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 59.5958 3.35844 -2 1.33000 110.837 53122.0 59.5776 6.46708 -3 1.46971 166.351 57166.5 57.7997 8.00082 -4 1.49354 223.684 59506.9 57.4974 3.2765 -5 1.50815 270.227 60941.1 57.46 1.11128 -6 1.51566 295.590 61502.5 57.4583 0.225599 -7 1.51851 304.294 61686.5 ======================================== Variances and Principal Axes 1 2 5 3.1431E-03| 1.0000 -0.0009 0.0000 4.8412E+04| -0.0009 -0.9994 0.0359 3.0490E+08| 0.0000 0.0359 0.9994 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.291e+02 5.197e+03 2.291e+02 4.411e+05 1.093e+07 5.197e+03 1.093e+07 3.045e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51851 +/- 0.359215 2 1 pegcut HighECut keV 304.294 +/- 664.138 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.16865E+04 +/- 1.74502E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.00752381 -3 1.51903 305.821 61722.6 ======================================== Variances and Principal Axes 1 2 5 3.1314E-03| 1.0000 -0.0008 0.0000 5.3972E+04| -0.0008 -0.9993 0.0376 3.1130E+08| 0.0000 0.0376 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.427e+02 5.256e+03 2.427e+02 4.948e+05 1.171e+07 5.256e+03 1.171e+07 3.109e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359363 2 1 pegcut HighECut keV 305.821 +/- 703.429 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17226E+04 +/- 1.76313E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000675987 1 1.51903 305.821 61722.4 ======================================== Variances and Principal Axes 1 2 5 3.1275E-03| 1.0000 -0.0008 0.0000 5.4975E+04| -0.0008 -0.9993 0.0379 3.1237E+08| 0.0000 0.0379 0.9993 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.291e-01 2.450e+02 5.264e+03 2.450e+02 5.045e+05 1.184e+07 5.264e+03 1.184e+07 3.119e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359310 2 1 pegcut HighECut keV 305.821 +/- 710.283 3 1 pegcut eMin keV 15.0000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 6.17224E+04 +/- 1.76612E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>newpar 3 100 Fit statistic : Chi-Squared 573.34 using 59 bins. Test statistic : Chi-Squared 573.34 using 59 bins. Null hypothesis probability of 7.16e-87 with 56 degrees of freedom Current data and model not fit yet. !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000729343 2 1.51903 305.821 28110.4 ======================================== Variances and Principal Axes 1 2 5 1.0065E-03| 1.0000 -0.0010 0.0000 3.5850E+04| -0.0010 -0.9992 0.0390 3.0840E+08| 0.0000 0.0390 0.9992 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.449e+02 5.386e+03 2.449e+02 5.042e+05 1.201e+07 5.386e+03 1.201e+07 3.079e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359146 2 1 pegcut HighECut keV 305.821 +/- 710.102 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 2.81104E+04 +/- 1.75480E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000729343 2 1.51903 305.821 28110.4 ======================================== Variances and Principal Axes 1 2 5 1.0065E-03| 1.0000 -0.0010 0.0000 3.5850E+04| -0.0010 -0.9992 0.0390 3.0840E+08| 0.0000 0.0390 0.9992 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.449e+02 5.386e+03 2.449e+02 5.042e+05 1.201e+07 5.386e+03 1.201e+07 3.079e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359146 2 1 pegcut HighECut keV 305.821 +/- 710.102 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 2.81104E+04 +/- 1.75480E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>fit 100 Parameters Chi-Squared |beta|/N Lvl 1:PhoIndex 2:HighECut 5:norm 57.4583 0.000725528 2 1.51903 305.821 28110.4 ======================================== Variances and Principal Axes 1 2 5 1.0065E-03| 1.0000 -0.0010 0.0000 3.5850E+04| -0.0010 -0.9992 0.0390 3.0840E+08| 0.0000 0.0390 0.9992 ---------------------------------------- ==================================== Covariance Matrix 1 2 3 1.290e-01 2.449e+02 5.386e+03 2.449e+02 5.042e+05 1.201e+07 5.386e+03 1.201e+07 3.079e+08 ------------------------------------ ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359148 2 1 pegcut HighECut keV 305.821 +/- 710.103 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 2.81104E+04 +/- 1.75481E+04 ________________________________________________________________________ Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom !XSPEC12>log pegcut_100_350kev.log Logging to file:pegcut_100_350kev.log !XSPEC12>show XSPEC version: 12.12.1 Mon Oct 24 05:15:22 2022 Auto-saving is done after every command. Fit statistic in use: Chi-Squared Minimization technique: Levenberg-Marquardt Convergence criterion = 0.01 Parameter fit deltas: 0.01 * parValue Using chain rule to calculate statistic derivatives (faster method). Querying disabled - will not continue fitting. Prefit-renorming enabled. Solar abundance table: angr Photoionization Cross-Section Table: bcmc: Balucinska-Church and McCammon, 1998 Cosmology in use: H0 = 70 q0 = 0 Lambda0 = 0.73 Model data directory: /software/lheasoft/release/x86_64-pc-linux-gnu-libc2.12/../spectral/manager/../modelData/ Plot settings: Showing of individual additive components is OFF. Showing of background spectra is OFF. Effective area normalization is OFF. Current unit settings: Energy = keV Wavelength = angstrom, with Y-Axis displayed per Hz X-Axis data display mode: Energy Spectra plots will be shifted to source frame by redshift value z: 0 Device: /null Plotting of line IDs is OFF. Splashpage is ON. xlog for data plots is ON. ylog for data plots is OFF. Default plot rebin settings for all plot groups: Min. Signif. Max. # Bins Error Type 0.00000 1 quad Responses read: ../sw01085430000b_preslew.rsp associated with spectrum 1 source 1 energies: 204 channels: 80 Distinct RMF files: /local/data/bat1/alien/Swift_3rdBATcatalog/event/batevent_reproc/trigger1085430/01085430000-results/pha/preslew_pha/../sw01085430000b_preslew.rsp 1 file 1 spectrum Spectrum 1 Spectral Data File: ../sw01085430000b_preslew.pha Net count rate (cts/s) for Spectrum:1 7.590e-02 +/- 4.068e-03 Assigned to Data Group 1 and Plot Group 1 Noticed Channels: 4-62 Telescope: SWIFT Instrument: BAT Channel Type: PI Exposure Time: 16.1 sec Using fit statistic: chi Using Response (RMF) File ../sw01085430000b_preslew.rsp for Source 1 Spectral data counts: 1.22226 Model predicted rate: 7.52017E-02 Current model list: ======================================================================== Model pegcut<1> Source No.: 1 Active/On Model Model Component Parameter Unit Value par comp 1 1 pegcut PhoIndex 1.51903 +/- 0.359148 2 1 pegcut HighECut keV 305.821 +/- 710.103 3 1 pegcut eMin keV 100.000 frozen 4 1 pegcut eMax keV 350.000 frozen 5 1 pegcut norm 2.81104E+04 +/- 1.75481E+04 ________________________________________________________________________ Using energies from responses. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Bayes is off !XSPEC12>error 5 Parameter Confidence Range (2.706) Due to zero model norms, the following fit parameters are temporarily frozen:1 2 Fit error occurred during lower bound error calculation. Apparent non-monotonicity in statistic space detected. Current bracket values 44721.9, 56976.8 and delta stat 1.65601, 8.17139 but latest trial 47423.2 gives 53.1 Suggest that you check this result using the steppar command. 5 0 50849.3 (-28110.4,22739) !XSPEC12>error 1 Parameter Confidence Range (2.706) 1 0.870637 1.81307 (-0.64839,0.294044) !XSPEC12>error 2 Parameter Confidence Range (2.706) Error occurred during lower bound error calculation. Fit statistic : Chi-Squared 57.46 using 59 bins. Test statistic : Chi-Squared 57.46 using 59 bins. Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Current data and model not fit yet. XSPEC12>/* XSPEC12>exit XSPEC: quit Spectral model in the cutoff power-law: ------------------------------------------------------------ Parameters : value lower 90% higher 90% Photon index: 1.51890 ( -0.648527 0.558745 ) Epeak [keV] : 147.003 ( -147.335 -147.335 ) Norm@50keV : 5.68972E-03 ( -0.00112842 0.00719695 ) ------------------------------------------------------------ #Fit statistic : Chi-Squared 57.46 using 59 bins. Reduced chi-squared = # Null hypothesis probability of 4.21e-01 with 56 degrees of freedom Photon flux (15-150 keV) in 16.1 sec: 0.615414 ( -0.056159 0.055879 ) ph/cm2/s Energy fluence (15-150 keV) : 6.94129e-07 ( -8.6523e-08 8.28812e-08 ) ergs/cm2